Evans

The Challenge

Vacant bank-owned 2-flat with a number of City of Chicago building violations.  In need of updating and repairs.

The Work

  • Four month project, November 2015 to February 2016.
  • Renovated floors 1 and 2. Three BR one Ba on each floor
  • Major renovations in kitchens and bathrooms
  • Hardwood floors refinished.  Vinyl plank flooring installed in kitchen and hallway.  Ceramic tile flooring in bathroom
  • Back porch replaced
  • Masonry repairs / tuckpointing
  • Roof repairs, garage door replacement, a few windows repaired

Project Costs

Equity Gain